Which tool is used to check or establish a true vertical line (plumb)?

Correct answer

A LEVEL (bubble vial) checks both horizontal/level AND vertical/plumb; a PLUMB BOB is a weighted line that hangs from a point, establishing true vertical due to gravity; modern LASER LEVELS project lines

  1. A A square
  2. B A LEVEL (bubble vial) checks both horizontal/level AND vertical/plumb; a PLUMB BOB is a weighted line that hangs from a point, establishing true vertical due to gravity; modern LASER LEVELS project lines
  3. C A tape measure
  4. D A chisel

Why this is the answer

Reference directions in construction: LEVEL equals HORIZONTAL (perpendicular to gravity, parallel to ground when ground is flat); PLUMB equals VERTICAL (parallel to gravity, perpendicular to a true horizontal); SQUARE equals at 90 degrees to another reference (often a corner or edge). Tools for each: SPIRIT LEVEL (BUBBLE LEVEL) is sealed glass vial partially filled with liquid (originally alcohol/spirit, hence the name) with a bubble; level when bubble is centered between marks; LEVELS have horizontal and vertical (plumb) vials; many also have a 45 degree vial; sizes from 9 inch torpedo to 8 foot levels; longer lengths give greater accuracy over distance. PLUMB BOB is pointed weight suspended from a string; gravity holds string vertical; for very accurate vertical reference over long distances (multiple stories); used by surveyors, masons. LASER LEVEL projects a laser beam or line; self-leveling (with pendulum mechanism) projects truly level/plumb lines; very accurate; modern construction standard; types include rotary (rotating point making horizontal plane), line lasers (projecting visible lines), cross-line (horizontal AND vertical at once). WATER LEVEL is clear hose filled with water; water surface in two ends will be at the same height (basic physics); used for establishing level over distances or around obstacles. SQUARENESS checks: TRY SQUARE has fixed 90 degree angle for small work; COMBINATION SQUARE is adjustable, multi-purpose (90 and 45 degrees, depth measurement); FRAMING SQUARE is large L-shape for layouts; tongue and blade; SPEED SQUARE is triangular layout for framing; SQUARENESS OF A RECTANGLE measured by both diagonals; if they're equal, the rectangle is square (geometric proof). For building a wall, deck, or any structure: mark and set corners by location (measurements); check PLUMB on uprights with level; check LEVEL on horizontal members with level; check SQUARE of overall structure with diagonal measurements or with 3-4-5 method (a triangle with sides 3, 4, and 5 units has a 90 degree angle between the 3 and 4 sides; mark 3 ft on one wall, 4 ft on adjacent wall; if distance between marks is 5 ft, it's square; multiples like 6-8-10 work for larger). LEVEL ACCURACY: check level on a known surface (set on table, mark position, flip 180 degrees; should read the same; if not, level is out of calibration). Modern quality levels are accurate; cheap ones often aren't. Digital levels show degrees precisely with a number. Check periodically; bumps and drops can affect accuracy. PLUMB BOB USE: suspend from high point; allow to settle (oscillation can take time); string is plumb when motionless; mark plumb point at base; for high accuracy, allow plenty of settle time; wind affects outdoor use. ESTABLISHING LEVEL: from a known reference point (existing foundation, established benchmark); use water level or laser for long distances; check periodically as work progresses. SPECIAL situations: when a floor slopes intentionally (drainage), level reference may not be horizontal but rather should match desired slope; when measuring from non-horizontal datum, use that reference; grounds out of level need shimming/leveling first.
Source: ASVAB SI, Level and Plumb

Practice more questions

This question is from our ASVAB Practice Tests practice test. Take the full practice test to test your knowledge across all Hand Tools and other topics.

Take the Shop Information practice test →

New to this exam? Our ASVAB exam guide explains the format, scoring, and how to prepare.

Related questions